Request for Comments: Draft 2 of Regulatory Framework Section


MassDEP welcomes comments on the second draft of the Regultory Framework section of the guidance documents.   This draft will be discussed at the next Regulatory Framework Subgroup meeting on Thursday 4/9 at 1 PM in the Boston office.

Draft 2 Regulatory Framework Section

Advertisements

2 Responses

  1. Sections 2.1 and 2.1.3 contain references to block wall construction. The link below to the Vapor Intrusion EPA Engineering Issue has considerations regarding block wall construction on pages 4, 7, 9, 17, 32 and Table 1.

    http://www.epa.gov/nrmrl/pubs/600r08115/600r08115.pdf

    Phil

  2. Hello – I just found out about this information from an LSP friend of mine. I work in the IAQ field and had not heard of this group but wondering if I could provide input for the group. I’ve been doing indoor air quality related consulting work for many years and may be able to provide some help for the indoor air quality side of the issues. My e-mail is ghatch@hillmanngroup.com. Thanks.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: